X

Macon Area Habitat for Humanity

24 likes, 1 comments2 days ago

Cassidy Dental Associates Expansion 12-05-18

Sheridan Construction has been serving the Cassidy Family for 3 generations spanning nearly 70 years! Our latest effort is with Cassidy Dental..

17 likes, 0 comments1 week ago

Sheridan Construction President, Christy Kovac, recently participated in a Community Clean Up Day as a part of the “Leader In Me” initiative…

26 likes, 0 comments1 week ago

Cassidy Dental Associates

Thanks Cassidy Dental Associates for choosing Sheridan Construction as your builder! The video conveys awesome enthusiasm and of course you can..

28 likes, 1 comments2 weeks ago

Our office and projects are closed today as we pause to reflect on all the things we have been blessed with and are thankful for! Happy Thanksgiving!

27 likes, 0 comments3 weeks ago

X
(478) 743-1578
100% Employee-Owned

The project included a new one-story Electro-Physiology (EP) Procedure space with two Lead Lined Labs, six Patient Care Rooms, and two Nurse Stations. The HVAC system installed also had HEPA filtration in the labs.  Approximately half of the project area was renovated space and the other half of the area was an addition of over a half acre of site consisting of concrete footings with steel structures and brick veneer. The main power for the lab had to be installed across 400 feet of existing hospital to the Electrical Room.

Location: Macon, Georgia
Owner: Coliseum Medical Centers
Architect: Dunwody/Beeland Architects

Portfolio